Module 7 of 12 · Async + Virtual · 1.5 hours

Project Kickoff

Module 7 resources. Start with the video. Keep the quick reference open during the work.

Module 7 throughline: Grace runs 2 kickoff meetings. The internal one creates alignment, the external one creates confidence, and the Project Manager owns both.
Async + Virtual1.5 hoursStarting Right

What you will be able to do

  • ✓Write the project’s success in one sentence your client would agree with, and use it to test whether the project is ready for a kickoff at all.
  • ✓Build a kickoff agenda that names a decision and an owner on every line, on the 3, 2, 1 clock. Draft, solicit, refine, assign, distribute.
  • ✓Staff the internal room and the external room on purpose, and hold every name on both lists to a test.
  • ✓Design Experience Points that trace to something your client actually said, and put them on the agenda before anything else.
  • ✓Lead both meetings, then close them with the Decision Log the same day and a written recap inside 24 hours.

Tools & resources

Tools & resources you will use

  • Kickoff Meeting agenda (starting point, edited by the PM)
  • Consultant deliverables and responsibilities document
  • Kickoff Brief (Participant generated)
  • One page Communication Plan (carried in from Module 6)

Listed items are the governance and operational tools tied to this section. Items marked “Participant generated” are built during the work.

The Archetype Lens

A warm kickoff can hide an unaligned project.

The People Pleaser reads harmony as alignment. The Accountable Owner uses kickoff to surface what is still unsaid.

At risk here

Competent Coordinator

Logs and documents instead of intervening. Trusts the meeting cadence over the timely call.

Obsessed Designer

Optimizes for the design. Treats budget, client ops, and team load as someone else’s problem.

At risk here

People Pleaser

Leads with relationship. Says yes, softens bad news, absorbs cost to dodge the hard conversation.

Accountable Owner

Owns the intersections. Reads signals early, stops work, presents options, protects the outcome.

The situation

Kickoff feels great. Nobody raises the hard constraints.

✗ The People Pleaser move

Takes the calm as consensus and leaves expectations soft.

✓ The Owner move

Confirms scope, decision rights, and the uncomfortable constraints out loud. Treats kickoff as confirmation.

Preview · full scenarios build with this module
Meet the four archetypes in depth →