| Phase | Who | Action | Tool |
|---|---|---|---|
| Start of project | PM | Choose an emerging designer from the team as the Storyteller. The office Storyteller Ambassador onboards them. | None |
| Pre Design | PM and ST | Request the project number and folder. Then the ACC Forma and Centerline projects, with every team member and consultant. Identify the project schedule with QA/QC dates for each phase. | Milo, ACC Forma, Centerline |
| SD, DD, CD | PM and ST | Edit the BIM and Excel QA Prompts with the design team. Set the progress reports. PM chooses the QC Reviewer and sets the dates. ST books the reviewer at least 3 weeks before the signing and sealing deadline. | QA Prompts, Centerline |
| End of each phase | Team, ST, QC Reviewer | Design team performs its own quality control review before the next phase. ST PDFs each sheet with the BIM QC Checklists and sends the QC Form to the QC Reviewer and the AOR. The QC Reviewer reviews the form and performs the review. | QC Form, BIM QC Checklist, project folder |
| Prior to permitting | AOR | Review the QC Form, check the drawings, sign and seal. | QC Form, QC report |
| Construction Admin | PM and ST | Keep Centerline current, construction tab included. | Centerline |
| Closeout | ST, PM | The Storyteller completes the A3. The PM reviews it. | A3 Template, Centerline |
Checks its own drawings against the QA Prompts. Runs its own review at the end of each phase.
Emerging designer who shadows the PM. Keeps the record, books the reviewer on the PM’s dates, sends the form, composes the A3.
Chosen by the PM. Reviews the form and the set against the BIM QC Checklist. From outside the team and office at CD.
Reviews the form, checks the drawings, then signs and seals.
The office Storyteller Ambassador onboards the Storyteller.
Project request, QC forms, QA/QC staff list, BlueBeam QC tools.
MiloThe checklist the design team uses to check its own drawings.
BIM template and ExcelWhat the QC Reviewer checks the set against.
MiloThe QA/QC record that travels with the set.
Milo, editable PDFLifecycle information, progress reports, QA/QC metrics, closeout form.
CenterlineThe project story, composed by the Storyteller.
A3 TemplateYou choose each reviewer and date. Your Storyteller books them 3 weeks out. At CD, choose a reviewer from outside the team and office. Plan the pickup window with the review.
Confirm each discipline checked its work against the prompts. Read the form before it goes.
Red lines picked up, then back checked. Items that cannot close go into the Design Team Report.
Check the team’s own review, the open items on the form, and the back check row. Then the AOR signs and seals.
| Row on the form | What a blank means |
|---|---|
| Phase Due Dates | The Schedule step never happened. Fix this first. |
| Design Review / Design Standards Review | Not done, or not recorded. Find out which. |
| Building Code / Zoning Review | Not done, or not recorded. Find out which. |
| QA Reviews / Red-lines Back Checked | Nobody can say the corrections reached the drawings. Not ready. |
| QC Peer Review (the Quality Review) | The independent review has not happened, or was never booked. |
| Areas Under Development | If you know of open items, the form is missing them. Record them before the set goes out. |