A recap of the September 10 call, for anyone who could not attend.
A recap of the eighth live discussion, part 1 of 2 on managing execution. The hour covered what proves work is done, how to set expectations without micromanaging, and where a PM should spend limited time. This summary carries the substance of the full call.
Meeting RecordingFull September 10 discussion · about 1 hourWhere the Room Started
Module 8 is part 1 of 2 on managing execution. This session covered what the PM does. Part 2 covers reading project data, and it waits until after the BST session so it matches how Grace uses BST. The module’s core idea: compare where the project is to where the plan said it would be, then turn each gap into an action.
What does a weekly review look like for a PM running more than one job? What fits a small, a medium, and a large project?
What proves a task is finished? What do you do when finished work keeps coming back?
Team members who can’t bring work in on time, and principals who want more involvement than the project can pay for.
One line from the survey. More so for a PM with more than one project.
Managing the work of several parties working in parallel takes time. A method that costs nothing doesn’t exist. The room was asked to set aside “I don’t have time” for 45 minutes and ask a different question: how do I spend this time so it returns more than it costs?
What Proves It’s Done
The survey asked what evidence proves to a PM that an estimate package is finished. The group was split. Most of the chat picked the first answer.
You check it against what you know about the whole project.
The dashboard shows what someone entered.
Spent hours say the budget is gone. The work can still be open.
People don’t know what they don’t know. They can believe it’s done when it isn’t.
Then the pushback. Does that mean a PM can never trust the team? The room said it depends on the task and the person.
Plan details from someone who has delivered them many times before. A quick check is enough. A full review of everything would fill the whole Friday.
The PM knows the most about the project and can see what’s missing, such as a material change that never reached the writer.
One line from the room: “Make me the PDF and send it to me.” Some teams also send key packages to a studio leader or principal for a final review.
Every check in, formal or informal, is a form of monitoring. The PM’s job is to know which work needs a personal look, which needs a few questions, and which needs only the person’s word. The aim is one system that joins those check ins into a single picture of the project.
Monitoring Without A Plan
One practice from the room: pencils down print sets at 50%, 75%, and 90%. The project lead reviews each one for what’s missing and what isn’t needed. QA/QC joins at 75% and 90%, and the 90% set goes to the owner before the permit submission.
The follow up: without a documented expectation, what does 50% look like? The answer was experience. Know what a typical CD set holds, cut it to the scope (an interior renovation has no exterior elevations), then look for legible drawings, general notes, annotations, and dimensions.
How do you make up 10% in the second half if the only check is at 50%? The room’s answer: work with the team through the first half. Know who needs more help, keep QC constant, and be in the model and the drawings yourself.
The Weekly Check In
Weekly check ins came up as a practice that helps a lot. One participant looks at the model first, then asks the team who has been working on what, and whether anyone needs help. The question put to the room: who should already know who is working on what? The PM.
That opened the real debate. Is spelling out the work micromanagement?
It feels respectful. It also leaves the scope, the time, and the finish line to the other person.
Some call this micromanagement. The session called it a PM who owns the work of the project.
The person knows exactly what you need and exactly when it’s done, so they know when to put it down and move to the next thing.
The 4 Expectations
If all you ask is “How’s it going?”, you’ll hear “Fine.” Any question you plan to ask about progress needs an expectation attached before the work starts.
Where Your Time Goes
Each week, ask where you thought the project would be, where it is, and where the gaps are. Collect the gaps across all your projects. That list is your PM Plan. Work that’s on track, and people who are doing well, get no extra time from you.
Then the hard part. Your own critical path task sits on your list, and 3 people are waiting on you for something. Which comes first? One answer from the room: give the others what they need first. Consultants need time to produce, and short time means late or weak work.
A 15 minute decision from you can start 4, 8, or 40 hours of work for someone else. Put first the item that starts the most work for the most people. Your own task can often wait until you have time for it.
A schedule makes this possible. It shows when consultants need information, such as reflected ceiling plans finished so the electrical engineer can start lighting. The same logic covers candid conversations: a team member who needs examples or support, or a principal who is too busy to meet the client when the project needs it.
The Principal In Charge
The Open Question
The room kept returning to the same needs: a plan, a schedule, what happens when, and clear expectations for every team member. As Grace grows into studios that serve market segments across locations, a person in Phoenix who joins a team in Florida should find the same method. How to do it, where it lives, and how to keep the learning curve short are still open.
A few points came up after the formal close.
Take It With You
The room asked how to do this quickly. The PM Planner is built for a 30 minute Friday.
The tools
The PM Planner runs the Friday routine on one page and prints the week as 2 sheets. The Quick Reference Guide is the job aid behind it.
What they cover
The Takeaway
A good plan makes monitoring easy. With no plan, every check in turns into an investigation, and investigations are the first thing dropped when a project gets busy.